Media

Proper Installation & Operation Tips for Coolant-Through Collets

Jun. 03, 2026

Based on long-term field application data, our company releases practical operation guidelines for coolant-through collets to help machine shops avoid leakage issues and fully tap into internal cooling processing benefits.
Prior to mounting, wipe away oil residue and metal chips from the tool holder and collet bore, and inspect end seals for cracks or wear. Assemble the collet with ER nut onto cutting tools and fasten with proper torque; over-tightening will deform the collet and compromise clamping accuracy. When connecting the coolant line, start with low-pressure trial run to spot leaks, then ramp up pressure to the machine’s standard working rating once no seepage occurs.
For routine maintenance, replace worn seals periodically and clear debris from coolant outlets to avoid blockages. Follow these practices, and the collet will deliver consistent end-face coolant spray, prolong tool life and greatly improve chip evacuation during CNC machining.

Proper Installation

Proper Installation


Email: ben@ht-tools.net

Whatsapp: +8615288891051

Name: Daria

Related News

Contact Us

Contact Us

Tel: +86 534 425 1888

Mob/WhatsApp/Wechat: +86 137 9138 1619

E-mail: jacksun@ht-tools.net

Add.:East Area of Economic Development Area, Pingyuan County, Shandong Province. China 253100

Send in Inquiry

Send in Inquiry

Copyright @ Pingyuan Haotian Machinery CO., LTD. All Rights Reserved | Sitemap | Powered by Reanod